St Clere’s school is an academy situated in Stanford le-hope Essex. CTC were contracted to convert a disused gym area into a usable space for the 6th form students.

CTC dealt with the design and installation of the project. This included the fabrication and installation of the mezzanine level, Blockwork formation for a seminar room. Power, data, Heating, emergency, and lighting design. The construction of a specialist staged seating area, introduction of a kitchen area and the supply and installation of all soft furnishings.

Work had to be completed whilst the students were active and as Ever CTC’s operations were carried out with our most rigorous safety standards.

Location

St Cleres School

Description

Conversion of gym into student breakout area

Project Value

£326,000.00

Programme

6 Weeks